Situation
Shapoorji Pallonji (SP) was awarded a US$ 25 Million contract to construct the 2007 Cricket World Cup in Providence, East Bank, Demerara, Guyana. SP awarded the project to a Lead Logistics Provider.
|
The requirements of the project were:
• Material to be sourced from multiple countries
• Shipments included heavy Construction Machinery such as Excavators, Loaders, Cranes, Dumpers, along with other supply materials such as tiles, bathroom furnishings, electrical fittings, etc.
• Scope of Work also included Reverse Logistics of equipment to the origin
Solution
• Real time, centralized view of all aspects of the freight process in the global arena
• Collaborating the orders of Multiple suppliers for delivery, leading to cost optimization
Achievements
• End-to-End visibility to Shapoorji Pallonji over sourcing of goods from various geographical locations
• Single window communication and control over entire Supply Chain
• Improved productivity & efficiency of operations
|
|
|
 |
 |
 |
 |
|